Below Ground Pipe System
Project Completed: 2014 | Location: Beverley
Below Ground Pipe System
This below ground pipe system is being installed for a new Biomass heating system what will replace two very old oil boilers. The new heating system involves the construction of a new boiler house that will become the Biomass plant room. The pre-insulated PEX pipe will feed the property with a new heating (flow & Return Circuit) This type of pipe system is designed where low heat losses are critical. 90m of pre-insulated pipe was installed for this Biomass Installation by Leighton's
(very nice job when sunny..!)